New Kid on the Block
![](/public/uploads/images/img_17061/1536901624-330w_img_17061.jpg)
Beljan Block
Constructing a hybrid building between two existing buildings with a busy street out front and a tight alley in the back, is no easy task. General contractor, Tri-Stad Construction, led the way on this project and hired Beam Craft to supply and install all the engineered wood-joisted floors. Beam Craft also provided the feature red oak heavy-timber stair treads at the Whyte Ave entrance.